Solar Panel Installation in Arvada, Colorado
Arvada publishes a short plan review target for complete solar applications. We send a complete plan set the first time so that clock starts clean.
What an Arvada install includes
- Complete plan set for Arvada's online permit portal
- Engineering matched to your side of Highway 93
- Flashed, permanent standoffs that allow a future re-roof
- Battery options: Enphase, Tesla Powerwall, Franklin and EG4
- 10-year workmanship warranty
What to know about going solar in Arvada
Arvada requires permits and inspections for every residential solar system and is specific about what to send. Applications go through the city's online permit portal as PDFs: a plot plan showing equipment locations, a wiring diagram and, where needed, a subcontractor approval form for the electrician. The city says technical plan review is completed within about a week of a complete application, and the applicant is emailed when the permit is ready.
Two Arvada rules change how a crew builds. Roof-mounted systems must sit on permanent standoffs attached to structural members and flashed, so the roof can be replaced later without compromising the system. And the engineer's report uses different wind design values east and west of Highway 93. Arvada runs from flat east-side neighborhoods to the foothills at Leyden and Candelas, so which side of 93 you live on changes the engineering.
Required inspections for an existing home are a final building and a final electrical inspection. Rough inspections apply to new construction.
Arvada, step by step
- Roof framing check and an engineer's report with the wind design for your location.
- Plan set with a plot plan, equipment locations and wiring diagram.
- Online submittal and city plan review.
- Install on flashed standoffs, then final building and final electrical inspections.
Foothills wind, outages and batteries
West Arvada sits closer to the foothills, where high-wind days are more common and Xcel has used Public Safety Power Shutoffs in parts of the Front Range foothills. A home battery keeps the fridge, furnace blower, internet and medical equipment running when the grid goes down, and it stores daytime solar for the evening.
Most Arvada homes are Xcel customers. Renewable Battery Connect pays $250 per kW of battery capacity, up to $5,000, for Tesla Powerwall and Enphase IQ batteries. Separately, Xcel offers a backup battery rebate of up to $10,000 for customers with a medical certification who live in Tier 2 or Tier 3 wildfire risk areas; we check whether your address falls in one of those areas before counting it. We install Enphase, Tesla Powerwall, Franklin and EG4, and we add batteries to existing solar.
Already have solar? See how we add a battery to an existing system. More on solar battery backup in Colorado.
Ways to pay
Cash, a RENU loan and a lease, compared for the same design. Arvada spans Jefferson and Adams counties, so we use your address's county for any income-qualified program checks.
Arvada solar installation FAQs
How long does Arvada take to review a solar permit?
Arvada says technical plan review is completed within about a week of a complete application. A complete first submittal is what keeps that timeline.
What inspections does Arvada require?
For an existing home, a final building inspection and a final electrical inspection.
Why does Arvada require flashed standoffs?
The city requires permanent, flashed standoffs attached to structural members so the system can accommodate a future re-roof.
Could I qualify for Xcel's wildfire battery rebate in Arvada?
Only if your address is in an Xcel Tier 2 or Tier 3 wildfire risk area and a household member has a medical certification. We check your address.
Is Arvada on Xcel Energy?
Most addresses are. We confirm by address.